Ascendent
ASCENDENT KILO · KERR COUNTY
DOC · KILO-PORT
REV · 3.1 · 2026.09.16
CLASS · CONFIDENTIAL — SUBJECT TO CONTRACT
Kilo campus in Kerr County — ranch boundary, terrain, and planned campus zones
Project Kilo · Kerr County, Texas

This is your campus.


Kerr County, Texas — Ascendent’s Kilo flagship. A 345 kV power path already in the utility file, land you control, and a campus you can walk from ranch to halls. Built for AI companies, labs, neoclouds, and hyperscalers.

KERR COUNTY / TEXAS
Kerr County, Texas. Aerial context over source terrain, with the ranch outline and planned campus zones. Planning view — not a survey plat. Imagery: Esri, Vantor, Earthstar Geographics & GIS User Community.
Your land
3,979.63 ac
Title-survey tract in Kerr County. Deeded to Blue Fox Development, LLC.
Your power path
2,100 MW
Requested load at 345 kV. LCRA study and PEC facility agreements are in place. Firm capacity is the next utility workstream.
Who is already at the table
LCRA + PEC
Executed study and facility-extension agreements. Construction and service follow the usual utility gates.
Ready today
Sequenced
Land control and the LCRA / PEC path are in hand. Firm capacity and site studies are the work we do with you.
00 Start with the site Start with the brief
01 Start here

Campus brief

The site, the land, and the power path on two pages. This is the conversation starter for your team.

02

Campus presentation

Fourteen slides for tenants and partners: land, power, generation, storage, cooling, fiber, and the work that comes next.

03

Site book

Campus, power, and utilities in one volume — what this site offers, and the workstreams that finish it.

04

Source annex

The underlying claims, notes, and next actions if you want to go deeper with counsel or engineering.

THE CAMPUS STORY

Walk the ground before you commit a hall.

The flyover puts you over the ranch, the planned campus zones, and the Kerr County landform. This is the site — not a screenshot of an internal file.

CAMPUS FLYOVER · Real aerial context over the ranch and planned campus. Silent; press play. Planning view. Imagery: Esri, Vantor, Earthstar Geographics and GIS User Community.
NX What happens next

Bring your brief. We map it onto this campus.

This room is for your team — AI operators, labs, neoclouds, and hyperscalers. Power, land control, readiness, and the campus story. Open items are workstreams we close with you.

  • Power: 2,100 MW at 345 kV is the study basis on the LCRA and PEC instruments. Firm capacity is the next utility workstream with your load case.
  • Land: the title survey is 3,979.63 acres. Phase I and appraisal used different scopes. We keep them separate on purpose.
  • Readiness: generation, fiber, and the water program already have a path. We close binding terms and site studies with you.
  • Campus: bring your phased load, cooling, and network brief. We will put them on this land.