Kilo campus in Kerr County, Texas
KERR COUNTY, TEXAS · POWER · LAND · READINESS · CAMPUS

Kilo.
Your campus-scale
AI site.

Power path. Land control. Readiness. Campus. Built for the teams that need halls, watts, and a partner who can finish the last mile.

Kerr County, Texas. Aerial context, ranch outline, and planned campus zones. Planning view. Imagery: Esri, Vantor, Earthstar Geographics & GIS User Community.
YOUR LAND
3,979.63 acres
Title-survey tract. Deeded to Blue Fox Development, LLC.
YOUR POWER PATH
2,100 MW / 345 kV
Study basis on executed LCRA and PEC instruments.
UTILITIES IN HAND
LCRA + PEC
Study and facility-extension agreements are executed.
KILO-PRES · KILOSource [1] · land-03 · grid-01/02/0301 / 14
P1 · THE CAMPUS

Land you can plan a campus on.

3,979.63 ac
TITLE-SURVEY TRACT · KERR COUNTY, TEXAS
  • A recorded special warranty deed names Blue Fox Development, LLC.
  • Survey and access instruments give you a real boundary to lay out halls, generation, and corridors.

Title exceptions, minerals, and the acreage crosswalk are closing work we do with you. Survey, Phase I, and appraisal used different scopes — we keep them separate.

Kilo surveyed tract on the Kerr County map
Your tract on the Kerr County map. Overlays are planning context, not a survey plat. Imagery: Esri, Vantor, Earthstar Geographics and GIS User Community.
KILO-PRES · KILOSource [1] · land-01/02/03 · access-01/0202 / 14
AscendentASCENDENT
KILO-PRES · REV 3.1 · 2026.09.16
CONFIDENTIAL — SUBJECT TO CONTRACT
P1 · THE PLACE

See the ranch. See the campus.

Campus on the landform

Kilo campus overview in Kerr County
Ranch outline and planned campus zones over real aerial context. This is the site you would take.

Closer on the planned halls

Kilo property and campus context
Same land, closer in. Planning zones, not graded pads or as-built halls.
KILO-PRES · KILOCampus geography · Kerr County03 / 14
The power path for this campus.
The power path for this campus.Source [1] · 2,100 MW / 345 kV study basis. Firm capacity is the next utility workstream.04 / 14
Grid path and on-site generation.
Grid path and on-site generation.Source [1] · Planned PEC ramp and Phase 1 BTM path. Not a ready-for-service date.05 / 14
P2 · ON-SITE GENERATION

Recip generation on your side of the meter.

  • This is the behind-the-meter recip story: engines on your campus, not a brochure map.
  • A Phase 1 CAT engine path is already in the file so you can design against a real plant.
  • Fuel, the lateral, and plant agreements are the next commercial workstream.

Planning path, not a ready-for-service date. We do not treat a schedule as power already in the building.

Siq Kit · CAT recip genset. Behind-the-meter generation for tenants. Planning model, not installed kit.
KILO-PRES · KILOSiq Kit section hero · planning model, not installed kit06 / 14
P2 · COOLING

Built for a liquid-cooled GPU campus.

  • Dry-cooler banks reject heat for liquid-cooled halls — GPU density, not office comfort cooling.
  • The water file already names wells and a prospecting program. Cooling design is how those sources get used.
  • Bring your cooling brief. We size rejection and the water program together.

A campus readiness story, not a tons or gallons commitment.

Siq Kit · dry-cooler bank. Liquid-cooled GPU campus rejection. Planning model.
KILO-PRES · KILOSiq Kit section hero · planning model, not installed kit07 / 14
P2 · FIBER

Connectivity you can see, not brochure fluff.

  • A documented LCRA backbone sits near the northern fence — close enough to plan a lateral from.
  • Exposed bundles, not a carrier logo slide. You can see the path into the halls.
  • Allocation, laterals, latency, and a second physical path are the network workstream.

Near is not contracted. Adjacency is the start.

Siq Kit · axonometric exposed duct and strand. Planning model, not an as-built lateral.
KILO-PRES · KILOSiq Kit section hero · planning model, not installed kit08 / 14
P3 · CAMPUS AND LANDFORM

See the campus as a place.

Kilo campus concept on the Kerr County landform
Campus concept for hall planning. Materials and light are editorial. Not an as-built photo or a capacity commitment.
Kerr County landform

Massing, terrain, and infrastructure can be reviewed together when you place halls.

These views help your team picture the campus. They are not a survey or an engineered design.

KILO-PRES · KILOSource [4] · Campus concept09 / 14
P2 · STORAGE

A buffer between generation and the halls.

  • Containerized storage sits between generation and the halls so you can buffer and shape load.
  • Capacity can land in blocks as the campus grows — you are not locked to one day-one bank.
  • This is the buffer narrative, not a committed megawatt-hour award.

A planning kit for how the site can work. We do not invent a storage award or a ready date.

Siq Kit · BESS container. Flexible capacity / buffer. Planning model, not a storage award.
KILO-PRES · KILOSiq Kit section hero · planning model, not installed kit10 / 14
P4 · WHO THIS CAMPUS IS FOR

Built for the teams
that need the next campus.

AI companies and labs

Phased halls, a 345 kV study path, and land enough to grow without stacking a second site search.

Neoclouds and hyperscalers

A campus you can brief against load, cooling, and network — then close the remaining utility and site workstreams with us.

Partners reviewing GPU-campus fit

Power scale, land control, and a documented interconnect path are the three things a serious campus review starts with. This site has all three in file.

A briefing frame for your requirements — not a claim that any named customer has committed.

KILO-PRES · KILOTenant briefing · Kerr flagship11 / 14
P4 · WORKSTREAMS

The work we do with you.

Grid and supply

Finish issued studies, approvals, upgrade scope, security, energy supply, and energization authority against your load case.

Gas and generation

Refresh binding fuel terms, lock the lateral, and advance plant, OEM, EPC, and air-permit work on the Phase 1 path.

Water and site

Drill and test priority wells, set rights and permits, and close a phased water and wastewater balance for your cooling design.

Network and schedule

Contract resilient fiber, survey laterals, add a second physical path, and name one governing campus schedule.

KILO-PRES · KILOSource [1] · Tenant workstreams we close with you12 / 14
P4 · HOW WE WORK WITH YOU

Bring your brief.
We map it onto this campus.

KILO-PRES · KILOAscendent engagement path · not a notice to proceed13 / 14
Kilo campus context in Kerr County, Texas
KILO · THE NEXT CONVERSATION

Walk the campus.
Shape the
next phase.

Bring your load, your cooling, and your network. We will put them on this land and name the work that finishes it.

REQUIREMENTS SESSION
CAMPUS FILE REVIEW
SCOPED TECHNICAL WORKSTREAMS
ASCENDENT LLC · PROJECT KILO
Kerr County, Texas. Aerial context, ranch outline, and planned campus zones. Planning view. Imagery: Esri, Vantor, Earthstar Geographics & GIS User Community.